How Long Does EV Charger Installation Take?

Table of Contents

Wall-mounted EV charger

You have just bought an EV, or one is on the way, and you want to start charging at home as soon as possible. So it is natural to ask how long the installation will take, and whether you need to take a day off work for it.

For most homes, the answer is good news. A standard home EV charger installation usually takes between 2 and 4 hours. Some jobs take longer, though, and knowing why can help you plan around it.

Want a Time Estimate for Your Home?

Tell us where you park, where your switchboard is and which charger you want. We’ll give you a realistic idea of how long your install will take.

The short answer: 2 to 4 hours for most homes

A typical installation is a single-phase wall charger mounted in a garage or carport close to the switchboard, with a board that has space for a new circuit. In that situation, our electricians can usually have the charger installed, tested and running within a morning or an afternoon.

That time covers the main steps:

What can make installation take longer?

Every home is a bit different. From the installs we do across Melbourne’s eastern suburbs, these are the things that most often add time to the job.

A long or tricky cable run

The distance from the switchboard to the charger makes a big difference. A short run inside an attached garage is quick. A run through ceilings, under floors, across a driveway or out to a detached carport takes more time, more cable and sometimes trenching.

Switchboard work

Many modern switchboards can take a new EV circuit without any trouble. Older boards may need extra space, new safety switches or a partial upgrade before the charger can go in. Depending on how much work is needed, this can stretch the job to a full day, or be booked as a separate visit.

Three phase supply

Most Melbourne homes run on single phase power, which comfortably supports a 7kW charger. If you already have three phase, installing a three phase charger is not much different in time. If you want to add three phase to a home that does not have it, that involves the electricity distributor and new supply work, which can take several weeks to arrange.

Mounting surface and location

Brick, render, timber or a freestanding post all need slightly different mounting work. Outdoor chargers may also need extra weather protection for the cable and fittings.

Approvals for apartments and townhouses

If you live in an apartment or a property with a body corporate, you may need approval before work can start. The installation itself may still be quick, but the approval process can take time, so it is worth starting early.

The full timeline, from quote to charging

Installation day is only one part of the process. Here is what the full timeline usually looks like:

When you book our EV charger installation, the site assessment and switchboard capacity check are part of the service. That way, any extra work is identified before installation day, not halfway through it.

How to prepare for a smooth install day

ev charger installation

A little preparation can help the job run on time:

Why it is worth doing properly

EV chargers must be installed by a licensed electrician and wired to the AS/NZS 3000 wiring rules. A rushed installation might look fine on the day, but poor cable sizing, the wrong protection or an overloaded switchboard can cause problems later. Taking the time to assess your home first is what keeps the install quick, safe and free of surprises.

Book your EV charger installation

Want to know how long the job will take at your place? Our licensed electricians can check your switchboard, cable route and charger location, then give you a clear time estimate and a fixed price before we start.

Contact Espresso Electrical or call 0478 799 972 for a free, no-obligation quote across Melbourne’s eastern suburbs.

Start Charging at Home Sooner

Most home installs take 2 to 4 hours. We check your switchboard and cable route first, so install day runs on time. Our licensed electricians work across Melbourne’s eastern suburbs.